Skip to main content

Olaniwun Ajayi LP

NERC Quarterly Report in a Nutshell

NERC Quarterly Report in a Nutshell

On 09 October 2024, the Nigerian Electricity Regulatory Commission (NERC) released its Q2 2024 report for the Nigerian Electricity Supply Industry (the Report). Section 56(3) of the Electricity Act 2023 requires NERC to report its activities to the President and the National Assembly every quarter.

In this publication, we concisely summarise the Report. Below are the key points from the NERC Q2 2024 report.

Electricity generation in the NERC Q2 2024 report

  • Grid-connected plants: 28 in total, made up of 19 gas, 5 hydro, 2 steam and 2 gas/steam plants. The number rose by one when the Zungeru hydro plant began operating on 29 April 2024.
  • Average available capacity: 4,395.77MW. Excluding Zungeru, capacity fell 5.28%, from 4,249.10MW in Q1 to 4,024.81MW.
  • Average hourly generation: 4,018.57MWh/h, or 8,776.55GWh over the quarter. Excluding Zungeru, output fell 9.52%, from 4,069.57MWh/h in Q1 to 3,682.02MWh/h.

Transmission

Average daily system frequencies (49.13Hz to 50.64Hz) were outside normal operating limits but stayed within stress limits. Meanwhile, average daily voltages (304.36kV to 355.13kV) were outside the prescribed limits. The national grid also suffered one partial collapse, on 15 April 2024.

The market and electricity distribution

  • Energy offtake: 3,165.93MWh/h, down 3.59% from Q1. However, cumulative DisCo offtake performance rose to 99.29%, from 92.35%.
  • Billing efficiency: 82.34%, up 1.89 percentage points from 80.45%.
  • ATC&C losses: 34.70%, down from 36.36% in Q1 but still 9.97 points above the 24.73% target in the Multi-Year Tariff Order.
  • Remittance: DisCos remitted only 79.76%, compared with 96.93% in Q1.
  • Bilateral customers: international customers paid USD9.81 million against USD15.60 million invoiced. Domestic customers paid NGN1,295.90 million against NGN1,991.30 million.

Regulatory functions and consumer affairs

NERC issued no new regulations in Q2 but made 42 orders. It also issued 5 off-grid and 2 on-grid generation licences, one trading licence, one system operator licence and one captive power permit.

On the consumer side, DisCos received 287,441 complaints, 1.35% fewer than in Q1. NERC’s forum offices received 1,720 new appeals. Only 49,188 customers were metered, a 60.86% drop from 125,664 in Q1. Sadly, 63 accidents caused 17 injuries and 34 deaths. Finally, the Report gave no figures for the Commission’s revenue or expenditure.

For the regulatory backdrop, see our note on the NERC Delineation Order. To read our full summary of the NERC Q2 2024 report, use the download button below.